Construction waste recycling line
Construction waste recycling line specific parameter configuration

Mineral grinding production line
Mineral grinding production line specific parameter configuration
150 tons per day of copper sulfide mineral processing
1, copper ore feed by vibrating feeder evenly sent to jaw crusher (coarse broken) be broken. The crushed ore conveyor transport through the material to jaw crusher (thin broken) twice broken.
2,2 times the broken ore material into the hopper through conveyor, mineral aggregate hopper discharge port by electromagnetic vibrating feeder uniform feed to the ball mill for grinding flour high fineness, and then enter the classifier classification.
3, grade copper powder into the mixing drum mixing, stirring to give a rougher flotation machine mortar pump through the pipeline.
4, get rougher scavenger flotation tailings into the machine, sweeping into the post-election selection of fine copper flotation machine, tailings into the tailings pond.
5, after get rougher flotation concentrate into selection, selection of the tailings into the rougher rougher again repeat step 4, after selection of fine copper filter directly into the final fine grading copper powder.