Granite crushing production line

Category: Production Line | January 13, 2014
  • Jaw Crusher
  • Impact Crusher
  • Cone Crusher
  • Sand Crusher
  • Mobile Crusher
  • Raymond mill
  • Ball mill
  • Vibrating feeder
  • Vibrating screen
  • Wheel sand washer
online support

If you want to buy the product, asking price or have any questions, you are free to contact our customer service.

Stone production line

Stone production line

Stone production line specific parameter configuration

--Read More--

Sand production line

Sand production line

Sand production line specific parameter configuration

--Read More--

Construction waste recycling line

Construction waste recycling line

Construction waste recycling line specific parameter configuration

--Read More--

Mineral grinding production line

Mineral grinding production line

Mineral grinding production line specific parameter configuration

--Read More--

Granite crushing production line,Granite crusher sale price.

Granite crushing equipment production process description:

First by vibrating feeder evenly into the granite jaw crusher, coarse crushing operations, and then carried into the stone crusher secondary crusher. If you want to stones and other small particles, based on the size of the required configuration shaker gravel layers, such as the need for the two finished stone, that a two-tier configuration shaker can. As for the sand, need to be ultra-fine-grained crushed by crusher crusher, sand can be 0-5mm, and through the sand washing machine to clean the mud and sand of some impurities, you can get a clean sand . This is the whole granite crusher sand production line processes.
Granite crushing production line
150 square granite crushing production line configuration list:

No
Product Name
Model
Single power
(KW)
Quantity
01
Feeder
1100×3800
3.7×2
1
02
jaw crusher
750×1060
90
1
03
impact crusher
1315
180
1
04
sand making machine
1010
75
1
05
Shaker (4 layers)
2160
30
1
06
Shaker (1 layers)
1548
11
1
07
sand washer
φ2800
7.5
1
08
Belt Conveyor
φ1000×18m
7.5×2
2
09
Belt Conveyor
φ650×25m
5.4×4
4

Granite crushing production line Caution:

1, regular observation opens the door to observe the internal stop sand making machine wear, center feed tube , cone hat, the impeller , indecent Road liner , circular shield , wearable pieces of the degree of wear after wear should be replaced or repaired , wear and should be replaced at the same time to replace the block , to ensure the same weight wearable pieces . Crusher observe the work process open the door to observe the inner workings of non- free danger. Timely replacement of worn impeller body found find manufacturers repair.

2 , the third generation of Sand Mobil Super car grease or 3 # lithium grease every 400 hours of adding the right amount of grease , working 2000 hours open spindle bearing assembly for cleaning , general work 7200 hours , replace bearings. Upper bearing spindle assembly is swimming side, the lower end bearing is fixed , pulled by hand after assembly pulley should be flexible rotation .

Granite crushing production line

3 , the drive belt tensioning triangle size should be adjusted appropriately to ensure uniform force triangle tape , dual-motor drive, the tape should be grouped on both sides of the triangle matching, each group has its length as consistent as possible . Should be adjusted so that the difference does not exceed two motor current 15A. Sand production line introduces the basic flow , stone evenly sent by the vibrating feeder jaw crusher for coarse broken, broken material from the coarse belt conveyor fed into the crusher for further crushing, crushing the material to be transported vibrating screen for screening to achieve the required product size material is fed into the sand washing machine cleaning, after cleaning the finished product conveyor output is finished ; does not meet the size requirements of the finished material back from the shaker sand reworked form closed loop several times . Finished size according to user needs to be combined and graded. If I choose to dry production process , can be equipped with the thickness of the powder separator and dust removal equipment. The sand production line high degree of automation , low operating costs, high crushing ratio , energy saving, large output, less pollution, easy maintenance, production of sand mechanisms in line with national standards for construction sand , uniform particle size , particle shape is good , with reasonable level . The sand production line equipment configuration is mainly based on customer specifications and production of stone and stone uses to determine .

Granite crushing production line prospects and value :

With plans to carry out the national highway , stone consumption in society is also a step by step increases , faced with this situation , granite crusher production line equipment is widely popular in society, granite crusher production line can be said that the last ten years the best solution to urban construction waste processing equipment , machinery production Shanghai Zhenping Xinlong granite crusher production line more customers at home and abroad has won wide acceptance and acclaim. Through continuous improvement of technology and innovation, granite crusher production line can produce products that meet a variety of industry standard stones , such as construction, highway construction, water conservancy construction. Demolition and construction waste mainly from repairs , new housing material loss during the old buildings, bridges , roads and other concrete construction waste will be generated , which must use the granite crusher production line can handle a large number of buildings rubbish. At present, China is in a period of rapid development of roads, railways , highways, real estate and other industries are developing rapidly , which would make the waste emissions increase .

According to the survey , China’s annual construction waste generated in the construction of the building to reach the million tons , most of them without any treatment , and some construction waste directly stacked in the open air , and some low-lying areas in the landfill , not only caused a environmental pollution, but also a waste of resources. In this case, we can recycle construction waste so that can be a good solution to this problem , in this basis, you can also get some economic benefits. You can also make these waste building materials to be reused again .

Please complete the fields below and we will respond to your inquiry within 24 hours:
(* denotes a required field)
* Product You Need:
* Your Name:
* Your Email:
* Country:
Telephone:
Quote Request/Comments: