
If you want to buy the product, asking price or have any questions, you are free to contact our customer service.



Construction waste recycling line
Construction waste recycling line specific parameter configuration

Mineral grinding production line
Mineral grinding production line specific parameter configuration
Select lead production line
A: Chemical Name: Lead chemical symbol: Pb
II: Lead ore deposit in the state of nature
Lead chromate, lead iodide, lead carbonate, lead sulfide, lead oxide
Three: rock industry standard (mining standards)
Element | With | S | WO3 | S | Mo | Ag(g/t) |
Content% | 0.06 | 4.0 | 0.06 | 0.08 | 0.02 | 2 |
Element | Sb | CaF2 | Cd | In | Would | Au(g/t) |
Content% | 0.4 | 5 | 0.01 | 0.001 | 0.02 | 0.1 |
Four: powder Quality Standard
Lead concentrate quality standards
Product class |
Pb is not less than,% |
Impurities is not more than,% |
||||
With |
Zn |
As |
MgO |
Al2O3 |
||
A product Two products Three products Four products Five items Six products Seven items |
70 65 60 55 50 45 40 |
1.5 1.5 1.5 2.0 2.0 2.5 3.0 |
5 5 5 6 7 8 9 |
0.3 0.35 0.4 0.5 Agreement Agreement Agreement |
2 2 2 2 2 2 2 |
4 4 4 4 4 4 4 |
Seven: Shanghai Xuan Shi Machinery Technology Co. Specialty
1 design professional production line;
2 ore testing, ore identification;
3 beneficiation industry research, plant design;
4 mineral processing equipment supply, installation guide;
5 can undertake turnkey projects.
This article Source: http://crushermachinesaleprice.com/select-lead-production-line/